How to conduct gas to a private house

First, you should take a series of actions and acquire a specific documentary basis for further work. So, first of all, get the acts of inspection of all the premises in which the GO will be installed. These acts include:

  • certificate that the chimneys were examined by the VDPO service;
  • permission for the tie-in (as already mentioned, often from GorGaz);
  • permission to conduct gas (from GlavAPU);
  • topographic image of the site;
  • photocopy of BTI registration certificate.

Then take the so-called technical conditions for connecting to the pipeline in GorGaz and conclude an appropriate contract with the design organization. And already on the basis of the project, calculate the estimate, and then conclude a contract for technical supervision. Agree on construction work and, upon completion of installation, issue technical documentation.

Agree with GorGaz on gas supply and further maintenance, go through a brief safety briefing, set a date for tie-in, carry it out, and the next day make a test run of gas.

It would seem that everything is simple, but many face certain difficulties. Therefore, we will consider how to conduct gas to a private house, in more detail and step by step.

We carry gas to a private house - step by step instructions

As already mentioned, you should start connecting with a kind of intelligence. Let's start with her.

Training

First of all, find out who owns the nearby gas pipeline. Contact the owner (most likely GorGaz) for permission to tie-in. Then head over to an engineering firm who will do the drafting for you.

Having taken the project and paid for it, go to the installation company. She will solve all issues related to the installation of the pipeline, and will also be responsible for the section of the highway. That is why, before signing a contract, inquire about whether the organization has a license to carry out work.

Now - directly to the process.

Stage 1. Collection of documentary basis

First, collect the documents (and there will be quite a lot of them) regarding the fact that you own the house and the plot, as well as the permits mentioned above for connecting to the gas pipeline. When the documents for starting work are finished and the installation has begun, do not relax - during almost the entire procedure, you will still have to draw up documents, such as:

  • permission from the head of the architectural department;
  • a copy of the technical passport of the BTI;
  • topography of the site (on a scale of 1:500 only) indicating all communications, which was certified by the gas service;
  • consent from neighbors (when the highway will cross neighboring sections);
  • documents for the civil defense planned for installation;
  • certificate of inspection of the chimney from VDPO.

Stage 2. Specifications

  • the passport;
  • registration certificate for the house;
  • document on the right to ownership of the site;
  • cadastral plan;
  • proof that you are the owner of the house.

If everything is in order with the documents, you will be offered to write an application for those. conditions.

Note! At the same time, there are several nuances. First, this service is paid. Secondly, you will be able to receive the conditions only after 2-4 weeks.

Stage 3. Drawing up a project

After completing the "paper" cases, contact one of the design firms (there are quite a lot of them lately). Arriving there, do not forget to inquire about the availability of a license to produce this kind of work! Check out the rates - the average cost of a finished project can range from 15 to 50 thousand rubles, depending on the specific office.

Note! You can also ask at GorGaz where it is better to turn.

After that, draw up an agreement with the organization. Make sure that it indicates the possibility of the designer's arrival on the site. This is extremely important, since it is this person who will approve the work and installation of this or that equipment (of course, after agreeing this with you). The finished project should be taken to GorGaz for approval, but this should be done by the person responsible for it. The procedure itself takes an average of 1-2 weeks.

After that, draw up an estimate in accordance with the project and draw up an agreement on those. supervision.

Stage 4. Agreement with a construction and installation company

When the documents are ready, and the questions are settled, go to a construction company, which in the future will be engaged in laying the gas pipeline and installing the entire civil defense on the site. Here you should also inquire about the availability of a license, since you will need to report on the work done to GorGaz.

Note! Often, construction companies have licenses to draw up projects. Therefore, if both are ordered in one place, then the cost of conducting gas to a private house can be significantly reduced.

After discussing prices and terms, conclude a contract - this will shift all responsibility for the results to the management of the organization. The contract must specify the obligations of each party. Make sure it contains the following items:

  • when carrying out work, the employees of the company must have fire extinguishing equipment at hand (including a protective screen - it is needed to avoid heating the walls in case of fire);
  • the firm bears all responsibility for the technical and executive documentation;
  • this documentation must be handed over to you immediately after the completion of all calculations for the work;
  • the company undertakes to perform the work within the agreed time frame, and with high quality.

Stage 5. Acceptance of the completed work

Upon completion of all work, a special commission, consisting of a representative of GorGaz, the contractor and you, must accept the results within 2-4 weeks. If everything is fine with the latter, then the representative of the gas service will issue you a technical supervision receipt - you will pay for it, and transfer a copy to the construction organization.

Make sure that during the check all the HE that is indicated in the project is installed and turned on. When the verification is completed, the organization will prepare technical documentation and transfer it to GorGaz, where it will be stored. Within 3 weeks after the transfer, you are required to seal the meter. Next, conclude a contract with GorGaz itself on gas supply. In the future, gas service workers will maintain the gas pipeline at the site and all related equipment.

There are a few more mandatory steps, but they have practically nothing to do with the documentary component of the question of how to conduct gas to a private house. However, they exist and cannot be avoided, so let's look at them briefly.

  • Lecture on safety. There is nothing complicated here - in GorGaz itself, such lectures are specially conducted by experienced engineers. There you will learn how to use gas correctly. After listening, the lecturer must sign in the appropriate journal.
  • Insertion into the gas pipeline. This will be done by a construction company, your duties include only timely payment for the work.
  • Setup and trial run of GO - the organization that sold you all the equipment is obliged to do this.

The price of connecting a private house to a gas pipeline

There are two types of tariffs for connection to the gas pipeline.

  • Standard- I operate within the city, if the distance to the highway does not exceed 10 meters.
  • non-standard- operates outside the city (25 meters).

There are several factors that affect the cost of work. This:

  • relief features;
  • method of laying a gas pipeline;
  • standard size of the gas meter;
  • soil quality;
  • house shape;
  • terrain type.

Note! As you can see, it is impossible to name the exact cost of the work, since it is determined individually for each case and depends on a number of conditions.

But if we generalize, we can derive approximate rates. They will look like this.

  • Connection to the gas line - from 3,400 to 7,100 rubles.
  • Connection between individual elements - from 25,700 to 158,500 rubles.
  • Checking and inserting into a private house - from 51,000 to 158,500 rubles.

Table. Comparative cost of installation and operation of different types of fuel for heating a country house (for an area of ​​160 m2 - an example).

Note! Before tapping into a gas pipeline, it is necessary to find out who owns it. In most cases, this is GorGaz. You must acquire an owner's agreement for a tie-in, and then contact the design organization (it, as you might guess from the name, will draw up a gasification project).

Ways to conduct gas to a private house

There are several ways to heat a country house with gas.


Nevertheless, it is the third option that is becoming increasingly popular, so we will talk about it. Note that gas pipelines are of two types, which should be known at least in general terms.


Note! Underground laying is more expensive, but the pipe itself in this case is more protected, and its service life, therefore, increases.

An elevated pipeline will last less, but it is easier to inspect and repair, and the road does not need to be blocked during installation / repair.

So, gasification of a country house is:

  • drafting a project;
  • tie-in to the pipeline;
  • intra-house branching of the pipeline;
  • installation of all necessary gas equipment (GO).

As a conclusion

Despite the fact that the cost of connecting to gas is quite high, this heating method is becoming increasingly popular. And the point here is, first of all, in economic benefits. Now you know how to conduct gas in a private house! Warm winters!